“Some of the things that this school has done that our district hasn’t done in the past is it was built to LEED (Leadership in Energy and Environmental design) standards,” she said, explaining it was designed for the environment. “Overall a construction type that the board would like to see further research considered for future construction,” he said.Īlvich said the classrooms at Claremont School are similar to the elementary schools in Monroe with cubicles. He said the committee found the school to be “a beautiful well laid out school,” however the school had some short comings in the area of the HVAC (heating, ventilation and air conditioning) system and some floor finishes. He said committee members visited Claremont Elementary School along with members of the administration including Schools Superintendent Dori Alvich. Peter Tufano, BOE chair of the of the Buildings, Grounds and Transportation Committee, said the committee had discussed student growth. The resolution also authorized and directed the administration to engage the district, architect and engineer of record to update the project costs estimated for additions to Barclay Brook and Brookside elementary schools and Monroe Township High School.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |